Free PMP Exam Study

  • Home
  • PMP Certification Guide
  • PMP Practice Exam
  • PMP Sample Questions
Home » PMP Practice Exam » Enjoy 160 PMP Practice Exam Free On Planning The Project (Domain II)

Enjoy 160 PMP Practice Exam Free On Planning The Project (Domain II)

02/27/2015 Brenda Wilson 0 Comment

Enjoy 160 PMP Practice Exam Free On Planning The Project (Domain II)

Confident yourself to pass the PMP exam with 160 PMP practice exam free on the domain II. When you have a good preparation that it is not difficult to pass the PMP exam with 200 questions during 4 hours and you just need to score 106 out of 200 questions. In a real exam, there are 5 domains included in your exam that you have to face to. Get further pmp information here. Here’s one of domain about planning the project. There are 24% questions will be asked in this domain.In order to ensure that you have enough knowledge to pass your exam that you should have a good preparation before taking the exam. Practice free online PMP prep exam question that is the best way to help yourself pass the exam. Here’s enjoy 160 PMP Practice Exam Free On Planning The Project(Domain II) that you can practice easily and remember deeply the concept of project management. Addition to this, full answers are available as soon as your submit. Enjoy us to discover now. Good luck!

You might be also interested in:
Killer Tricks And Tips To Accelerate Your PMP Exam Marathon
Buy 25th Hour, 32nd Monthly Day And Extra Time For PMP Exam Study
8 Easy Ways To Become Cost Effective On PMP Exam Studies
Mad About PMP Distracting Exam Questions
All You Should Know To Create A Powerful PMP Exam Brain Dump

Enjoy 160 PMP Practice Exam Free On Planning The Project(Domain II) - Page 1

Control Charts Use in Perform Quality Control
Tools and Techniques for Plan Quality
accurate data
Inputs to Plan Quality
Perform Quality Control: Project Management Plan Updates
Perform Quality Control: Project Document Updates
They reflect the maximum and minimum values allowed. There may be penalties associated with exceeding the specification limits
• Quality audit reports• Training plans• Process documentation
Trend Analysis is often used to monitor
Inputs to Perform Quality Assurance
the result either conforms or does not conform
Failure Costs
• Identify all the good/best practices being implemented,• Identify all the gaps/shortcomings,• Share the good practices introduced or implemented in similar projects in the organization and/or industry,• Proactively offer assistance in a positive manner to improve implementation of processes to help the team raise productivity, and• Highlight contributions of each audit in the lessons learned repository of the organization
Is a structured, independent review to determine whether project activities comply with organizational and project policies, processes, and procedures
Targets for Improved Performance
refers to the total cost of all efforts related to quality throughout the product life cycleProject decisions can impact operational costs of quality as a result of product returns, warranty claims, and recall campaigns. Therefore, due to the temporary nature of a project, the sponsoring organization may choose to invest in product quality improvement, especially defect prevention and appraisal, to reduce the external cost of quality
Approved Change Requests Reviews
Benchmarking
Pareto Chart
Some examples of quality metrics include on-time performance, budget control, defect frequency, failure rate, availability, reliability, and test coverage
that the measured value is very close to the true value
Quality Control Measurements Use in Perform Quality Assurance
Outputs of Perform Quality Assurance
• Doing It Right First Time (DIRFT)• Quality is Conformance to Requirements• System of quality is Prevention• Performance standard is Zero Defects• Measurement of quality is the price of non-conformance
Characteristics of a Run Chart
Cost Benefit Analysis
Quality Audit is Technique used in
Quality Metric is not used for
Statistical Sampling
Project Results
The process of monitoring and recording results of executing the quality activities to assess performance and recommend necessary changes
• Upper and lower control limits are set by the project manager and appropriate stakeholders to reflect then points at which corrective action will be taken to prevent exceeding specification limits. • For repetitive processes, the control limits are generally ± 3σ. • A process is considered out of control when a data point exceeds a control limit or if seven consecutive points are above or below the mean
• Contains the quality management plan, which is used to control quality• The quality management plan describes how quality control will be performed within the project
• Internal (found by the project) • External (found by the customer).
used to visually identify logical groupings based on natural relationships
Characteristics of Quality Audits
Design of Experiments
WBS Dictionary Use in Plan Quality
keeping errors out of the process
• Rank ordering is used to focus corrective action. • The project team should address the causes creating the greatest number of defects first.• Pareto diagrams are conceptually related to Pareto's Law• Pareto diagrams can also be used to summarize various types of data for 80/20 analyses.

Related Posts

  • 401 Free PMP Practice Exams Quiz Questions and Answers (Part 2)401 Free PMP Practice Exams Quiz Questions and Answers (Part 2)
  • 401 Free PMP Practice Exams Quiz Questions and Answers (Part 1)401 Free PMP Practice Exams Quiz Questions and Answers (Part 1)
  • 56 Other Practice PMP Exam for CAPM/PMP All in One Exam Guide Chapter 356 Other Practice PMP Exam for CAPM/PMP All in One Exam Guide Chapter 3
  • 26 Necessary Free PMP Practice Exams Quiz Questions26 Necessary Free PMP Practice Exams Quiz Questions

Share:

  • Facebook
  • Twitter
  • LinkedIn
  • Tumblr
  • Pinterest
  • Email
  • More
  • Print
  • Reddit
  • Pocket

Related

Category: PMP Practice Exam/ PMP Sample Questions Tags: free pmp practice exams/ pmp certification practice exams/ pmp exam prep questions/ pmp mock exam/ pmp practice exam/ pmp practice exam questions/ pmp practice exams/ pmp practice test

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

PMP Practical Exam Prep

  • PMP Mock Exam – Initiating The Project
  • PMP Practice – Project Quality Management
  • PMP Test Questions – Project Resource Management
  • PMP Samples Questions – Human Resource Management
  • PMP Practice Exam – Project Time Management
  • PMP Tests – Project Communication Management
  • PMP Question Exams – Project Stakeholder Management
  • PMP Question bank – ITTO Project Scope Management
  • PMP Exam Questions – Project Risk Management
  • PMBOK 5th Edition PMP Practice Questions
  • PMP Samples Test – Planning The Project
  • PMP Practice Test – Project Integration Management
  • PMP Exam Samples – Project Management Framework

Recent Posts

  • 401 Free PMP Practice Exams Quiz Questions and Answers (Part 2)
  • 401 Free PMP Practice Exams Quiz Questions and Answers (Part 1)
  • 56 Other Practice PMP Exam for CAPM/PMP All in One Exam Guide Chapter 3
  • 26 Necessary Free PMP Practice Exams Quiz Questions
  • 58 Free Project Time Management Questions for Information Technology Project Management 6th Edition by Schwalbe

Copyright © 2023 · Pmp Exams Prep · Privacy Policy · About · Contact

Copyright © 2023 · Paradise v3.2.0 on Genesis Framework · WordPress · Log in